A good lot size has a significant impact on the performance of the system. In this second post, I look at the influence of the machine batch size on the lot size. I also briefly go into the lot sizes for the processing industry, and also administrative processes. In my next and last post I will look at how to manage different lot sizes in different parts of the value stream.
Information Flow
How to Determine Your Lot Size – Part 1
There are a few factors that can influence lot size: machine batch size, changeover time, size of the container, shipment sizes, and the size of your customers’ orders, which then are combined in the set up of the information flow. All of these factors can be influenced to move toward the true north of lot size one! Also, do not confuse the lot size with the number of parts per kanban. They are related but can be different. In this series of three posts, let me explain in more detail how the factors come together for you to determine the lot size of your processes.
How to Ramp Up a Kanban System – Part 2: The Switch
In my last post I described how to prepare for the implementation of a kanban system. This post goes into more detail on the actual change to the new kanban system. You surely know that every part should have a kanban. But what do you do if you have more kanban than parts? What do you do if you have more parts than kanbans? Find the answers below.
How to Ramp Up a Kanban System – Part 1: Preparation
Designing a kanban system on paper is much easier than implementing it on the shop floor. In many of my previous posts I discussed the design of a kanban system in detail. In these two posts I will discuss the steps needed to actually put the system on the ground. This first post is the preparation, and my next post will be the actual switch to the new kanban system.
Kanban Card Design
A kanban is, in its basics, information to reproduce or reorder parts. Hence, in its most basic form it has to say “make me this part” or “bring me this part.” While such very simple kanban systems are possible, usually it helps to include other information on the kanban card. In this post I want to talk about the design details of a kanban card, especially what kind of information we should include on the card. Please note that the items on the list below are suggestions. Which ones you actually include depend on the system you want to establish.
How to Make “Just in Time” Work – Part 2
In my previous posts I explained what “Just in Time” is, and started with different actions on how to make “Just in Time” work. As it turns out, there are a lot of things you can do, and one blog post was not enough. So here’s part two on how to make “Just in Time” work! As before, be warned that most of these methods or actions are not easy!
How to Make “Just in Time” Work – Part 1
Just in Time (JIT) is the delivery of parts just when you need them. In my last post I explained what JIT is all about. In this post (and the next one) I will go into much more detail on different measures you can take toward JIT. But be warned, most of them are not easy, either in implementing or in convincing cost accounting about it beforehand.